D5401 at Pitsford in early March 2048x1536 DSC00020.JPG 2007-02-28 13:09:13 |
D5401 and two other low loaders in Quorn yard on the 15-3-07 2048x1536 DSC000201.JPG 2007-03-15 15:21:37 |
A Network Rail water carrier being unloaded 2048x1536 DSC00021.JPG 2007-03-15 15:21:56 |
A bit rare 7 people making a ramp and all Allelly's employee's, needless to say D5401 was off the low loader in 20 minutes 2048x1536 DSC00023.JPG 2007-03-15 15:52:47 |
A general view of quorn yard on the 15th March 2048x1536 DSC00024.JPG 2007-03-15 15:53:08 |
Early March I have just undercoated the bufferbeam before applying a top coat a few days later 2048x1536 DSC00025.JPG 2007-03-06 17:36:02 |
Now unloaded and running waiting to propel the water carriers to Loughborough 2048x1536 DSC00026.JPG 2007-03-15 16:19:50 |
The two gents I must thanks for getting D5401 ready at Pitsford and sorting the movement of the loco to Quorn. John and Andy Pepper (caretakers of D5185) 2048x1536 DSC00027.JPG 2007-03-15 16:31:38 |
A random view of D5401, 764 and 2104 in Pitsford Yard 2048x1536 DSC00028.JPG 2007-03-06 17:36:55 |
Getting ready to move to Loughborough 2048x1536 DSC000281.JPG 2007-03-15 16:33:31 |
At Loughborough station 2048x1536 DSC00029.JPG 2007-03-15 16:54:26 |
for the first time in about five years 25035 and 27056 together on the same railway 2048x1536 DSC00030.JPG 2007-03-17 11:54:42 |
27056 waiting a FTR from Tom Tighe 2048x1536 DSC00031.JPG 2007-03-17 12:51:05 |
Both working and both in respectable paint finishes and togther. At this point we had just coupled them togther to start testing of the multi jumpers 2048x1536 DSC00032.JPG 2007-03-17 14:24:30 |
The radiator settling tanks decided to leak and this means a hell of alot of removing the water cooler group and this was taken after the elements were removed and the internal air duct was loose but not removed 2048x1536 DSC00324.JPG 2007-11-07 15:59:53 |
some of the now stored radiator elements which will be tested and replaced as required 1536x2048 DSC00326.JPG 2007-11-07 16:00:35 |
after removing the roof hatch on B side. this hasn't seen major attention since 1982 and it shows. it is mostly flaky paint which looks worse than it is 2048x1536 DSC00329.JPG 2007-11-08 11:26:50 |
Martin Harris was in the process of starting to remove B side elements 1536x2048 DSC00332.JPG 2007-11-08 12:36:17 |
With A side done and with day light it was then windy standing here... But much work needed and new studs aswell. 2048x1536 DSC00333.JPG 2007-11-08 12:36:28 |
To show how much hard it was parting the radiator frame from the settling tank, we managed to destroy two knuckle joints doing this 2048x1536 DSC00346.JPG 2007-11-27 11:47:53 |
Alas success one radiator frame free from the loco, 1536x2048 DSC00351.JPG 2007-12-05 14:22:12 |
Two free radiator frames, which are now stored pending cleaning, repairs and painting 1536x2048 DSC00353.JPG 2007-12-05 14:43:26 |
The settling tanks still place 2048x1536 DSC00354.JPG 2007-12-06 13:37:43 |
The mud was around three inches deep!!!! 2048x1536 DSC00355.JPG 2007-12-06 13:38:00 |
| | | |